Traverse City Light & Power

Project consisted of installation of new 1000kW emergency generator and paralleling 480 volt switchgear to allow TCL&P to peak shave on demand.

This unit was designed with a SCADA system interface to allow TCL&P dispatcher to remote start unit and monitor unit status on and off line.

Engineering services included:

  • Preliminary design
  • Switchgear and control procurement
  • Construction observation
  • Assistance with start-up services
  • SCADA design & installation
  • Record drawings
  • Closeout documentation

Additional Info

  • Project: Britten Banner 1000kW Peak Shaving Generation
  • Client: Traverse City Light & Power
  • Location: Britten Banners, Traverse City, Michigan
More in this category: Gordon Foods Green Oaks, MI »