This project replaced an aged overhead 4.16kV distribution system with a new looped underground 12.5kV distribution system including all electrical services within the project boundaries. The project incorporated multiple critical loads including a wastewater treatment plant, regional hospital and large medical facility.
Engineering services included:
- Project planning & cost estimating
- ROW Procurement
- Underground system design
- Material procurement
- Bidding & contract documents
- MDOT Permitting
- Construction observation
- Switching & outage coordination
- Record drawings
- Closeout documentation