Cloverland Electric Cooperative

Project consisted of the reconstruction of 20 miles of three-phase overhead distribution line. A total of five RUS distribution work plan rebuilds were included in this project.

Circuits from 12.5kV & 24.9kV substations were included in the reconductoring projects. Conductor size was increased to #336.4 ACSR to provide circuit capacity for backing up nearby substation circuits and to minimize voltage drop.

Engineering services included:

  • Distribution line design
  • Staking sheet preparation
  • Construction assembly drawings
  • RUS 790 Contract documents
  • Material procurement
  • Construction staking
  • Construction observation
  • Inspection for RUS219 approval
  • RUS Closeout documentation 

Additional Info

  • Project: Distribution Line Reconstruction Rus Work Plan Projects - 2005
  • Client: Cloverland Electric Cooperative
  • Location: Dafter, Michigan