Michael P. McGeehan, PE

Michael P. McGeehan, PE
President

Registration: 1998 / Professional Engineer / Michigan / No. 45127

Years of Experience: 25 years, 10 years with Greiner/URS Corporation, 15 years with GRP Engineering, Inc.

Education: BS / 1993 / Electrical Engineering / Michigan Technological University

Professional Affiliations: Michigan Society of Professional Engineers (MSPE); Institute of Electrical & Electronic Engineers (IEEE)

Certifications: HAZWOPER 40-Hour Training

Expertise: Electrical engineering - medium and high voltage power systems. Specializing in design and operation of transmission & distribution systems. Design of over 175-miles of overhead and underground distribution line; transmission line route selection and design up through 345kV; substation design and relay modernizations; and various electrical studies.

Key Projects

City of Petoskey - Petoskey, Michigan

  • Multiple 12.5kV distribution conversion to underground projects.
  • Distribution substation expansion design.
  • Municipal Marina electrical upgrade.

Great Lakes Energy - Boyne City, Michigan

  • Multiple distribution line reconstruction projects totaling over 130 miles in length.

Mackinac Bridge Authority - St. Ignace, Michigan

  • Electrical system and bridge lighting replacement.
  • Primary electrical system switch controller upgrade project.

Traverse City Light & Power - Traverse City, Michigan

  • 69kV & 13.8kV conversion to underground project.
  • 69kV transmission line routing and design.
  • Transmission system thermal upgrade.

Grand Haven Board of Light & Power - Grand Haven, Michigan

  • Multiple 13.2kV distribution conversion to underground projects.
  • Distribution line reconstruction projects.
  • Downtown alley 13.2kV conversion to underground projects.

Wolverine Power Cooperative - Cadillac, Michigan

  • Multiple 69kV transmission line relocation projects.
  • Optical ground wire installation project.

Holland Board of Public Works - Holland, Michigan

  • Multiple 138kV transmission line projects.
  • 138kV underground feasibility study.

Michigan Department of Management & Budget - Lansing, Michigan

  • Design 8.32kV electical system upgrade for State Secondary Complex.

Cloverland Electric Cooperative - Dafter, Michigan

  • Multiple distribution line reconstruction projects totaling over 70 miles in length.
  • Distribution line work order inspections.

Cherryland Electric Cooperative - Grawn, Michigan

  • Multiple distribution line reconstruction projects.
  • Line relocation and right-of-way acquisition.

Lowell Light & Power - Lowell, Michigan

  • Distribution line routing and right-of-way acquistion.
  • Double circuit aerial spacer cable system with integral optical messenger project.

Marquette Board of Light & Power - Marquette, Michigan

  • Transmission & distribution circuit upgrades at the Shiras Steam Plant & Substation.
  • 69kV transmission steel pole relocation project.