Project consisted of the construction of 1.75 miles of double circuit and 2.0 miles of single circuit 69kV transmission line.

This project was completed to provide a second reliable transmission source into the rapidly growing Traverse City, Michigan area. The transmission line was constructed with traditional round wood poles, laminated wood poles, and self-supporting steel poles. An optical ground wire was included for utility communications, relaying, and SCADA control. The project was completed as part of a critical system upgrade including a new switching station and distribution substation upgrades.

Engineering services included:

  • Project planning & cost estimating
  • Route selection & surveying
  • ROW Procurement
  • Environmental Assessment
  • Transmission line design
  • Material procurement
  • Bidding & contract documents
  • Construction observation
  • Record drawings
  • Closeout documentation

Additional Info

  • Project: GT2 69kV Transmission Line
  • Client: Traverse City Light & Power
  • Location: Traverse City, Michigan