System also provided power to life safety load throughout complex. Generators were specified with 12.47kV primary voltage so that they could be paralleled directly to the local utility in the future.
Engineering services included:
- Preliminary design
- Generator procurement
- Switchgear and control procurement
- Bidding & contract documents
- Construction observation
- Assistance with start-up services
- Record drawings
- Closeout documentation