Grand Haven Board of Light & Power

Project consisted of the relocation of 0.2 miles of double circuit, three-phase overhead distribution line to allow for boat storage facility construction.

Vertical clearance was maintained for movement of boats throughout the storage yard area. This project was designed and constructed during the winter months to eliminate the impact on boat movement.

Engineering services included:

  • Route & cost analysis
  • Distribution line design
  • Staking sheet preparation
  • Construction assembly drawings
  • Contract documents
  • Material procurement
  • Construction staking
  • Construction observation

Additional Info

  • Project: Distribution Line Reconstruction Grand Valley Marina
  • Client: Grand Haven Board of Light & Power
  • Location: Grand Haven, Michigan