Grand Haven Board of Light & Power

Project consisted of the replacement of 200A dead-front sectionalizing cabinets with 600A S&C PMH switchgear.

New switchgear provides the ability to easily shift load between multiple distribution circuits. Circuit taps were sectionalized with 200A fused taps to increase system reliability for these critical industrial loads. Fault indicators, including SCADA contact outputs, were added to all cables to minimize outage time during fault locating.

Engineering services included:

  • Project planning & cost estimating
  • Underground system design
  • Material procurement
  • Bidding & contract documents
  • Construction observation
  • Industrial customer outage coordination
  • Switching order preparation
  • Record drawings
  • Closeout documentation

Additional Info

  • Project: Airpark Industrial Park 13.2kV Underground System Upgrades
  • Client: Grand Haven Board of Light & Power
  • Location: Grand Haven, Michigan